The bathroom, a most necessary place, comes together....

A view of the bathroom tile after installation.

Some of the plumbing for the toilet and sink. Blue is for cold and red is for hot. Note the wooden frame behind the studs on the upper right hand side of the image. The sink will be installed against that.

 

More plumbing. The red and blue are for the hot and cold water to the sink. The white goes to the vent stack. The larger orange-ish pipes are supply and return lines for the radiant floor heat in the Studio, Gallery, and Office.

More plumbing. Here you see the mount for the sink and the plumbing stubs for the sink.

 

First pass at the bathroom platform.

 

At the beginning.
Settling in...
Ready for living.
Posted on 12/2007