The Gallery begins to take shape..... |
|
![]() |
The painted Gallery wall. |
![]() |
The side of the Gallery with the exterior door. |
![]() |
We painted it with the washer and dryer stuck temporarily in the middle of the floor. |
![]() |
With the floor painted - fianally empty. |
![]() |
Looking through the Gallery to the Studio door. |
![]() |
Trying a futon in the Gallery. |
![]() |
Looking from the Office through the Gallery toward the Studio. |
![]() |
From the other direction. Too crowded with the futon. |
![]() |
Trying a single bed and the Nordic Trak. A better fit. |
![]() |
A temporary sleeping situation -- until I can get upstairs. |
Posted on 12/2007 |
|