| Radiant floor heat tubing installed in the 17' studio. Ready to pour the slab... | |
| Framing the bathroom/utility room -- 12 sides.... | |
The cable at the top of the outside wall ties it all together....
|
|
| A look through the ceiling boards as they go up | |
The bathroom / utility Yurt and the studio Yurt (background).... |
|
| TwoYurts, waiting in the snow.... | |
| The studio Yurt with the windows in.... | |
| Looking through the windows of the studio Yurt.... | |
| Studio Yurt from on the inside...ceiling view.. | |
| Next Posting | |
Posted March 15, 2005 |