Radiant floor heat tubing installed in the 17' studio. Ready to pour the slab...
Framing the bathroom/utility room -- 12 sides....

The cable at the top of the outside wall

ties it all together....

 

A look through the ceiling boards as they go up

The bathroom / utility Yurt and

the studio Yurt (background)....

TwoYurts, waiting in the snow....
The studio Yurt with the windows in....
Looking through the windows of the studio Yurt....
Studio Yurt from on the inside...ceiling view..
Next Posting
Posted March 15, 2005