The post, bracket (thanks, Bob!), and 8" X 8" frame for the platform on which the Upper Yurt will be built. There will be a Lower Yurt, walls and ceilings, etc., that will surround the Upper Yurt, providing living, dining, and kitchen space. |
![]() |
The completed frame, sitting atop four peeled logs (a maple, a pine, and two cedar) from the land. The platform is a 12' square (not many right angles in this building project!). |
![]() |
This is the "hub" of the platform, linking together the eight cantilevered joists. |
![]() |
The wall posts are set on the Upper Yurt platform. |
|
The lintels are nestled between the tops of the wall posts. |
![]() |
Starting the roof, the ceiling boards are installed first. |
![]() |
The ceiling is now in place, and the ring beams are installed. |
![]() |
Six inches of foam insulation (R-39) is now installed between the ring beams. |
| Looking down the Upper Yurt roof at the oval slab for the Gallery and the 17' diameter studio. Note the roof boards on the Upper Yurt roof. | |
![]() |
The roof sheathing is on, the cedar breather (the black stuff) is in place, and the shingling is started. |
![]() |
The wall sheathing for the Upper Yurt is being installed. Windows will be constructed in each of the 16 base-up triangles formed by the wall posts -- all the way around. The Upper Yurt is to be the bedroom, accessed by a spiral staircase. There will be a half-bath up there. |
| Next Postings | |
Posted on June 13, 2005 |